initial commit
This commit is contained in:
@@ -0,0 +1,30 @@
|
||||
# Poona Hospital AMS — Implementation Plan Summary
|
||||
|
||||
**Status:** Phases 0–8 complete, plus Excel exports / bulk import / responsive layout as of commit `22fad38`.
|
||||
|
||||
For local development, Docker Compose, seeding, and test commands, see [README.md](../README.md).
|
||||
|
||||
## Tech Stack
|
||||
|
||||
| Layer | Technology |
|
||||
|---|---|
|
||||
| Backend API | FastAPI + Pydantic v2 (`Python 3.13`, `uvicorn`) |
|
||||
| Database & ORM | SQLAlchemy 2.0 (`SQLite` with indexed 19-table schema) |
|
||||
| Authentication & Security | JWT (`python-jose`), `bcrypt`, 5-role RBAC, sliding-window login rate limiter |
|
||||
| Background Scheduler | `APScheduler` (`06:00` daily alert evaluation job) |
|
||||
| Exports & Bulk Import | `openpyxl` (styled `.xlsx` reports & 2-sheet import template), `csv`, SheetJS (`xlsx`) |
|
||||
| Frontend UI | React 18, TypeScript, Vite, Tailwind CSS, shadcn/ui, TanStack Query & Table, Recharts |
|
||||
| Packaging & Docs | Docker, Nginx reverse proxy, `docker-compose.yml`, Demo Script & Acceptance Checklist |
|
||||
| Testing | `pytest` + `httpx` (`ASGITransport`), `Vitest` + React Testing Library |
|
||||
|
||||
## Phases Overview (0–8)
|
||||
|
||||
- **Phase 0 — Scaffold:** Project layout, FastAPI health endpoint, React + Vite + Tailwind + shadcn/ui shell, Makefile.
|
||||
- **Phase 1 — Auth, Masters & Settings:** JWT login/me, 5-role RBAC matrix, Admin Master Lists CRUD, typed System Settings, and `seed.py`.
|
||||
- **Phase 2 — Asset Register & Attachments:** Full Asset CRUD (`409` duplicate check), `AssetPicker`, department scoping, magic-byte validated attachments.
|
||||
- **Phase 3 — Breakdown & Complaint Lifecycle:** Sequential `complaint_no`, IST response/downtime calculations (`clip_downtime_to_month`), workflow transitions & technical-field locks.
|
||||
- **Phase 4 — Preventive Maintenance & Calibration:** In-house/outsourced PM table & 7-column calendar views, clamped `add_months`, gated calibration approval & certificates.
|
||||
- **Phase 5 — Contracts, Warranties, Insurance, Demo & Visits:** Contract renewal chain (`is_superseded`), warranties, insurance drawer, overdue demo equipment, department visit rounds.
|
||||
- **Phase 6 — Notifications, Alerts & Dashboard:** Daily `APScheduler` 7-type deduplicated alerts, TopBar Demo Clock, calibration login modal, and role-scoped Recharts dashboard.
|
||||
- **Phase 7 — Operational Reports & Exports:** 8 operational reports with formula transparency, `daily-visit` RBAC, server-side `.xlsx`/`.csv` exports, and A4 `@media print`.
|
||||
- **Phase 8 — Polish & Packaging:** Global quick search (`/api/search`), Admin audit log viewer (`/api/audit-logs`), DB indexes, login rate limiting, Docker Compose, and demo/acceptance docs.
|
||||
Reference in New Issue
Block a user