Throughput Rate
+1.2% vs Stage 3
86.0
tasks / hr
Turnaround Latency (Mean)
-36.2% Latency
80.8
seconds
Total Travel Distance
-33.8% Distance
5,061
meters
Fleet Energy Drawn
-57.6% Energy
0.835
kWh
Traffic Conflicts & Safety
0 Unresolved
0
collisions (100% safe)
System Throughput & Order Fulfillment Rate
Tasks completed per elapsed operating hour ($X = N / \Delta T$)
Stage 1: 86.0 tasks/hr (86 completed)
Stage 3: 85.0 tasks/hr (85 completed)
Stage 3.1: 86.0 tasks/hr (86 completed)
Turnaround Latency Distribution (Mean, p50, p90, Max)
Cycle duration from order injection to rack/dock deposit ($\tau = t_{\text{comp}} - t_{\text{create}}$)
Stage 3.1 slashed mean turnaround by -36.2% (80.80s vs 126.71s) and p90 by -34.8% (116.18s vs 178.04s).
Fleet Travel Distance (Loaded vs Empty Deadhead)
Stacked odometer distance in meters ($D_{\text{total}} = D_{\text{loaded}} + D_{\text{empty}}$)
Empty repositioning deadhead cut by -51.3% (2,481m vs 5,098m); Loaded ratio improved from 33.3% to 51.0%.
Total Energy Consumed (kWh) & Specific Energy per Task
Battery draw during motion, payload handling, and idle ($E_{\text{total}}$ and $\text{EI}$)
Stage 3.1 reduced fleet energy by -57.6% (0.8353 kWh vs 1.9699 kWh) and energy intensity to 0.0097 kWh/task.
Cargo Distance Utilization
Loaded payload vs Empty deadhead
Stage 3.1: 50.97% Loaded vs Stage 3: 33.31% Loaded
Traffic Conflict Safety Rate
Arbitrated yields vs Unresolved collisions
Stage 3 & 3.1: 100% Resolved (0 Collisions) vs Stage 1: 0% Resolved (46 Collisions)
5-Pillar Multi-Objective Score
Normalized efficiency benchmark (0–100%)
Throughput • Turnaround Speed • Distance • Energy • Safety
Traffic Contention Wait Time & Conflict Frequency
Total seconds AMRs spent yielding right-of-way at intersection stoplines vs. conflicts detectedMaster Multi-Stage Performance Comparison Matrix
Ground-truth mathematical evaluation across all operational stages for workloaddemo_orders.csv (3,600s horizon)
| Performance Metric | Symbol & Units | Stage 1: Baseline | Stage 2: Progression | Stage 3: Hybrid Optimal | Stage 3.1: Efficiency-Optimized | Stage 3.1 vs Stage 3 (Δ) | Acceptance Target | Status |
|---|
Stage 3.1 Controlled 6-Candidate Ablation Study
Systematic evaluation isolating the exact impact of each optimization layer on top of Stage 3| Candidate ID | Architectural Innovation Isolated | Throughput (tasks/hr) | Turnaround Mean (s) | Turnaround p90 (s) | Total Distance (m) | Loaded Ratio (%) | Total Energy (kWh) | Unresolved Conflicts | Yield Wait (s) |
|---|
Stage 2 Systematic 5-Candidate Progression Search
Exploratory search across charging layouts, directional arterials, and ABC slotting policies| Candidate | Charging Architecture | Circulation Scheme | Slotting Strategy | Coordination Policy | Unresolved Conflicts | Selection Verdict |
|---|
KPI Engineering Reference & Mathematical Handbook
Comprehensive definitions, formal governing equations, physical units, and operational explanations for all facility KPIsNVIDIA Omniverse™ OpenUSD Stage Assets & Video Streams
Direct file references for interactive 3D simulation playback in Omniverse Kit 110.4Stage 1
Centralized Baseline Scene
Original warehouse with centralized NW charging cluster and bidirectional corridors.
results/demo_staged/usd/stage_01_baseline.usda
Stage 2
Optimization Progression Scene
5 candidate layouts evaluated for decentralized charging and directional highways.
results/demo_staged/usd/stage_02_optimization_progress.usda
Stage 3
Hybrid Optimal Facility Scene
Decentralized 8-bay charging (3/3/2), perimeter one-way arterial highways, and ABC slotting.
results/demo_staged/usd/stage_03_final_optimized.usda
Stage 3.1
Efficiency-Optimized Hybrid Facility Scene
Northbound Zone A arterial, cross-aisle spurs, payload-matched dispatching, yielding -33.8% distance and -57.6% energy.
results/demo_staged/usd/stage_03_1_efficiency_optimized.usda
Winning Production Stage