feat(phase3): implement SimPy discrete-event simulation engine, multi-zone order generation, fleet dispatcher, and wider Zone B aisles
This commit is contained in:
@@ -120,11 +120,11 @@ The testing architecture adheres to the following principles:
|
||||
|
||||
- **Completed**:
|
||||
- **Phase 0 (Environment and Foundation)**: Core architecture, rotating file logs, configuration loaders, environment verification.
|
||||
- **Phase 1 (Warehouse Model)**: 540-node topological navigation graph, reachability validation, zone restrictions, graph JSON export.
|
||||
- **Phase 2 (Robot and Task Models)**: Robot state machine (`IDLE` through `CHARGING`), legal transition tables, task priority & lifecycle models, inventory catalog with stock reservation & replenishment, telemetry events, and OpenUSD robot fleet visualization. 56 passing unit tests.
|
||||
- **Phase 3 Target**: Implement Discrete-Event Simulation Engine (`warehouse_twin.simulation`):
|
||||
- SimPy simulation environment managing clock time.
|
||||
- Dynamic order arrival processes for Zone A (Poisson), Zone B (Normal), and Zone C (Deterministic batch).
|
||||
- Task queueing and priority dispatcher assigning compatible AMRs.
|
||||
- Full simulation lifecycle execution with KPI collection.
|
||||
- **Phase 1 (Warehouse Model)**: Topological navigation graph, reachability validation, zone restrictions, graph JSON export.
|
||||
- **Phase 2 (Robot and Task Models)**: Robot state machine (`IDLE` through `CHARGING`), legal transition tables, task priority & lifecycle models, inventory catalog with stock reservation & replenishment, telemetry events, OpenUSD robot fleet visualization.
|
||||
- **Phase 3 (Discrete-Event Simulation Engine)**: SimPy master clock execution, multi-zone order arrival streams (Zone A Poisson, Zone B wide-aisle Gaussian, Zone C scheduled feed, auto-replenishment), priority-based fleet dispatcher with NetworkX shortest-path scoring, robot mission lifecycles (transit, pick, drop, recharge), telemetry streaming, and `run-sim` CLI command. 72 passing unit tests.
|
||||
- **Phase 4 Target**: Routing and Fleet Assignment:
|
||||
- NetworkX dynamic shortest-path routing with congestion edge weights.
|
||||
- Time-space reservation grids to eliminate intersection collisions and aisle deadlocks.
|
||||
- Dynamic rerouting and cooperative yielding rules.
|
||||
|
||||
|
||||
Reference in New Issue
Block a user