1. Executive Summary
| Metric | Simulated Value | Unit | Definition / Scope |
|---|---|---|---|
| Simulated Duration | 3,600.0 | s (1.00 hrs) | Total discrete-event simulation time |
| Wall-Clock Time | 0.581 | s | Compute time required for headless simulation |
| Random Seed | 42 | - | Deterministic PRNG seed for workload reproducibility |
| Tasks Created | 87 | tasks | Orders generated by stochastic arrival process |
| Tasks Completed | 85 | tasks | Successfully picked and delivered orders |
| Completion Rate | 97.7% | % | Completed / Created ratio |
| Throughput | 85.00 | tasks/hr | Normalized hourly order fulfillment rate |
| On-Time Delivery Rate | 100.0% | % | Percentage of tasks completed before deadline |
| Overdue Tasks | 0 | tasks | Completed missions exceeding target SLA |
| Missed Deadlines | 0 | tasks | Production-line feed deadline violations |
| Fleet Utilization | 28.7% | % | Aggregate active busy time / total fleet available time |
| Total Distance Traveled | 7,644.3 | m | Aggregate distance traversed across all AMRs |
| Loaded Distance Ratio | 33.3% | % | Loaded transit distance / total travel distance |
| Total Energy Consumed | 1.9699 | kWh | Load-dependent battery energy draw |
| Energy Intensity | 0.0232 | kWh/task | Electrical energy consumed per completed mission |
2. Latency & Duration Distributions
All duration statistics in seconds (strictly calculated over completed tasks):
| Metric | Mean | Std Dev | Min | Median (p50) | p90 | p95 | p99 | Max |
|---|---|---|---|---|---|---|---|---|
| Turnaround Time | 126.7s | 40.0s | 43.3s | 129.4s | 178.0s | 211.8s | 222.6s | 247.3s |
| Queue Waiting Time | 59.0s | 37.9s | 6.0s | 59.8s | 102.6s | 138.9s | 160.3s | 160.6s |
| Mission Execution | 67.8s | 19.4s | 37.3s | 64.7s | 88.7s | 105.5s | 123.7s | 123.7s |
3. Spatial & Distance Telemetry
- Total Fleet Distance:
7,644.3 meters - Loaded Transit Distance:
2,546.6 meters(33.3% efficiency) - Empty Repositioning Distance:
5,097.8 meters - Aggregate Busy Duration:
10,318.0 s - Aggregate Idle Duration:
25,682.0 s - Aggregate Charging Duration:
0.0 s - Handling Duration (Pick/Drop):
3,165.0 s - Yield & Contention Wait Time:
39.0 s
Individual Robot Fleet Telemetry Matrix
| Robot ID | Type | Total Dist (m) | Loaded Dist (m) | Empty Dist (m) | Utilization | Busy (s) | Idle (s) | Charging (s) | Min SoC | Final SoC | Energy (kWh) |
|---|---|---|---|---|---|---|---|---|---|---|---|
amr_heavy_01 |
Heavy | 1,671.3 | 536.2 | 1,135.2 | 63.5% | 2,284 | 1,316 | 0 | 97.0% | 97.0% | 0.4436 |
amr_heavy_02 |
Heavy | 1,571.0 | 442.6 | 1,128.4 | 56.9% | 2,048 | 1,552 | 0 | 97.3% | 97.3% | 0.3996 |
amr_heavy_03 |
Heavy | 1,516.9 | 495.7 | 1,021.3 | 60.9% | 2,191 | 1,409 | 0 | 97.2% | 97.2% | 0.4176 |
amr_heavy_04 |
Heavy | 1,265.7 | 461.5 | 804.3 | 50.8% | 1,830 | 1,770 | 0 | 97.5% | 97.5% | 0.3748 |
amr_heavy_05 |
Heavy | 1,136.8 | 367.7 | 769.1 | 40.6% | 1,462 | 2,138 | 0 | 98.0% | 98.0% | 0.3022 |
amr_light_01 |
Light | 70.6 | 17.8 | 52.8 | 2.0% | 71 | 3,529 | 0 | 99.9% | 99.9% | 0.0044 |
amr_light_02 |
Light | 56.6 | 25.8 | 30.8 | 1.8% | 64 | 3,536 | 0 | 99.9% | 99.9% | 0.0037 |
amr_light_03 |
Light | 54.6 | 33.8 | 20.8 | 1.8% | 64 | 3,536 | 0 | 99.9% | 99.9% | 0.0040 |
amr_light_04 |
Light | 52.6 | 33.8 | 18.8 | 1.7% | 63 | 3,537 | 0 | 99.9% | 99.9% | 0.0038 |
amr_light_05 |
Light | 248.2 | 131.8 | 116.4 | 6.7% | 241 | 3,359 | 0 | 99.5% | 99.5% | 0.0161 |
4. Energy & Charging Operations
| Operational Metric | Value | Units |
|---|---|---|
| Total Fleet Energy Consumed | 1.9699 | kWh |
| Total Energy Delivered by Chargers | 0.0000 | kWh |
| Net Energy Balance | -1.9699 | kWh |
| Minimum Fleet Battery SoC | 97.0% | % |
| Average Fleet Battery SoC | 98.6% | % |
| Opportunity Charging Sessions | 0 | sessions |
| Mandatory Low-Battery Charges | 0 | sessions |
| Available Charging Bays | 0 | stations |
| Average Bay Occupancy | 0.0% | % |
| Average Charging Queue Wait | 0.00 | seconds |
5. Workload Breakdown by Task Type
| Task Type | Created | Completed | Pending | Failed | Throughput (t/hr) | Avg Turnaround | Avg Wait | Avg Exec | On-Time % |
|---|---|---|---|---|---|---|---|---|---|
| ORDER_PICK | 79 | 77 | 0 | 0 | 77.0 | 124.7s | 60.6s | 64.1s | 100.0% |
| PRODUCTION_LINE_FEED | 6 | 6 | 0 | 0 | 6.0 | 124.9s | 25.4s | 99.5s | 100.0% |
| REPLENISHMENT | 2 | 2 | 0 | 0 | 2.0 | 209.7s | 95.1s | 114.6s | 100.0% |
6. Traffic Contention & Bottleneck Diagnosis
- Traffic Conflicts Detected:
20 - Yield Waits Executed:
20 - Cumulative Yield Waiting Time:
39.0 s - Deadlock Reroutes Triggered:
0 - Deadlocks Prevented:
0(Zero active deadlocks)
Top Contested Corridors & Engineering Recommendations
| Severity | Corridor | Traversals | Conflicts | Total Wait (s) | Recommendation |
|---|---|---|---|---|---|
| INFO | station_picking_station_a1 <-> wp_260_20 |
39 | 6 | 10.0s | Minor transient yielding. Monitor during peak demand shifts. |
| INFO | wp_180_200 <-> wp_180_220 |
3 | 2 | 5.0s | Minor transient yielding. Monitor during peak demand shifts. |
| INFO | wp_320_40 <-> wp_320_60 |
38 | 2 | 4.5s | Minor transient yielding. Monitor during peak demand shifts. |
| INFO | wp_180_240 <-> wp_180_220 |
26 | 2 | 4.5s | Minor transient yielding. Monitor during peak demand shifts. |
| INFO | wp_320_80 <-> wp_320_100 |
32 | 2 | 4.0s | Minor transient yielding. Monitor during peak demand shifts. |