1. Phase Tracker

Phase Description Status Test Coverage
Phase 0 Environment and project foundation COMPLETED 17 passed
Phase 1 Warehouse model COMPLETED 26 passed
Phase 2 Robot and task models COMPLETED 56 passed
Phase 3 Discrete-event simulation COMPLETED 72 passed (100%)
Phase 4 Routing and fleet assignment Planned (Next) -
Phase 5 Charging and operational constraints Planned -
Phase 6 Analytics and experiment framework Planned -
Phase 7 Omniverse USD visualization Planned -
Phase 8 Operational dashboard Planned -
Phase 9 Optimization and final demonstration Planned -

2. Completed Tasks (Phase 3)

  • Modified Zone B (slow-moving specialized inventory) with wider aisles (4.0\text{m} width):
    • Updated config/warehouse.json with aisle_width: 4.0.
    • Configured WarehouseGraphBuilder with 4.0\text{m} column spacing across Zone B (x \in [32.0, 36.0, 40.0, 44.0]).
    • Added unit test test_slow_moving_zone_b_has_wider_aisles verifying 4.0\text{m} vs 2.0\text{m} aisle spacing.
  • Implemented multi-zone order generator (src/warehouse_twin/simulation/order_generator.py):
    • Zone A: Poisson process (expovariate) for fast-moving components.
    • Zone B: Gaussian distribution (gauss) for heavy parts, targeting Zone B's wider aisles.
    • Zone C: Deterministic scheduled batch deliveries feeding production line dropoff.
    • Automated stock replenishment order generation when inventory dips below minimum threshold.
  • Implemented fleet dispatcher (src/warehouse_twin/simulation/dispatcher.py):
    • Priority task queue sorting by (priority, deadline, release_time).
    • AMR payload compatibility filtering and Zone B heavy AMR restriction enforcement.
    • Minimum battery headroom (20\%) filtering.
    • NetworkX shortest-path distance calculation for nearest idle robot allocation.
  • Implemented SimPy discrete-event simulation engine (src/warehouse_twin/simulation/sim_engine.py):
    • Master clock coordinator and discrete process manager.
    • Full AMR mission lifecycle: empty transit, picking, stock reservation, loaded transit, dropoff.
    • Battery discharge and automated fast-recharging at charging bays.
    • Real-time telemetry streaming to logs/simulation_events.jsonl.
    • Comprehensive KPI metrics collection (throughput, turnaround time, wait time, utilization, energy).
  • Added run-sim CLI subcommand to src/warehouse_twin/cli.py.
  • Expanded test suite to 72 unit tests (100% pass rate in 0.37s).
  • Created docs/phases/phase_3_simulation_engine.md.

3. Test & Validation Summary

  • Total Unit Tests Executed: 72
  • Passed: 72
  • Failed: 0
  • Execution Time: ~0.37 seconds
  • Test Suites:
    • test_environment.py: 5 passed
    • test_logging.py: 3 passed
    • test_config_loader.py: 9 passed
    • test_warehouse_graph.py: 12 passed
    • test_robot_model.py: 14 passed
    • test_task_model.py: 9 passed
    • test_inventory_model.py: 4 passed
    • test_events_model.py: 1 passed
    • test_order_generator.py: 6 passed
    • test_dispatcher.py: 4 passed
    • test_sim_engine.py: 5 passed

4. Benchmark Performance (1-Hour Simulation Run)

  • Simulated Duration: 3,600.0s (1.00 hour)
  • Wall-clock Execution Time: ~0.45s
  • Tasks Created: 86
  • Tasks Completed: 84
  • Throughput: 84.00 tasks/hr
  • Average Turnaround Time: 96.3s
  • Average Waiting Time: 31.9s
  • Average Execution Time: 64.4s
  • On-Time Delivery Rate: 100.0%
  • Fleet Utilization: 53.2%
  • Replenishment Triggers: 1