Project Status: Warehouse Robot Fleet Digital Twin
Last Updated: October 21, 2026 Current Phase: Phase 9: Optimization and Final Demonstration (COMPLETED) Status: ALL PHASES (0 THROUGH 9) COMPLETED - Project Fully Delivered
5 layout architectural variants: baseline, decentralized_charging, directional_highways, velocity_slotting, and hybrid_optimal.
Directional highway circulation loop (South Eastbound, East Northbound, North Westbound, West Southbound) with bidirectional access spurs eliminating head-on corridor deadlocks.
Decentralized charging bays placing chargers directly adjacent to Zone A/B/C picking zones.
Velocity-based inventory reslotting assigning high-demand SKUs to racks closest to packing/shipping.
Hybrid optimal layout combining all architectural improvements.
Unit test suite: 5 passed in tests/unit/test_layout_optimizer.py.
Computes quantitative absolute and percentage deltas across throughput, p_{90} latency, conflicts, wait times, loaded travel ratio, and energy consumption.
Composite multi-factor scoring formula [0.0, 100.0] weighting throughput, latency reduction, conflict elimination, and loaded travel efficiency.
Generates automated qualitative takeaways for executive auditing.
Unit test suite: 2 passed in tests/unit/test_benchmark_comparator.py.
Unit test suite: 2 passed in tests/unit/test_dashboard_server.py.
Built Interactive Single-Page Application (src/warehouse_twin/dashboard/static/):
index.html: Semantic layout with navigation bar, live polling status pill, tab controls, KPI card grid, AMR fleet table, congestion visualizer, scenario comparison matrix, and full report markdown viewer.
Linear rank-interpolated percentile calculation (p_{50}, p_{90}, p_{95}, p_{99}) and DistributionStats computation.
Strict isolation of incomplete tasks (pending and in-progress) from completed turnaround and execution latency metrics.
Throughput, turnaround time, queue waiting time, mission execution time, and on-time SLA compliance tracking.
Fleet operational efficiency: utilization percentage, loaded vs. empty distance traveled, loaded ratio %, and energy intensity (\text{kWh}/\text{task}).
Charging bay occupancy, charging wait times, and per-task-type performance breakdowns (ORDER_PICK, PRODUCTION_LINE_FEED, REPLENISHMENT).
Unit test suite: 5 passed in tests/unit/test_kpi_calculator.py.
Documentation & Changelog: Created docs/phases/phase_6_analytics_and_experiment_framework.md, updated CHANGELOG.md and README.md.
Test Suite: Expanded to 129 passed unit tests (100% pass rate in 0.99s).
6. Test & Validation Summary
Total Unit Tests Executed: 157
Passed: 157
Failed: 0
Execution Time: ~3.05 seconds
Pass Rate: 100.0%
Test Suites:
test_environment.py: 5 passed
test_logging.py: 3 passed
test_config_loader.py: 9 passed
test_warehouse_graph.py: 12 passed
test_robot_model.py: 14 passed
test_task_model.py: 9 passed
test_inventory_model.py: 4 passed
test_events_model.py: 1 passed
test_order_generator.py: 6 passed
test_dispatcher.py: 4 passed
test_path_planner.py: 9 passed
test_reservations.py: 7 passed
test_traffic_manager.py: 7 passed
test_battery_model.py: 6 passed
test_charging_manager.py: 3 passed
test_production_deadlines.py: 3 passed
test_task_reassignment.py: 2 passed
test_stockout_and_replenishment.py: 1 passed
test_sim_engine.py: 5 passed
test_trajectory_export.py: 1 passed
test_kpi_calculator.py: 5 passed
test_event_store.py: 4 passed
test_heatmap.py: 4 passed
test_experiment_runner.py: 4 passed
test_scenario_comparison.py: 2 passed
test_trajectory_player.py: 4 passed
test_animated_usd.py: 2 passed
test_kit_extension.py: 2 passed
test_dashboard_data_provider.py: 3 passed
test_dashboard_server.py: 2 passed
test_optional_dependencies.py: 2 passed
test_layout_optimizer.py: 5 passed
test_fleet_optimizer.py: 4 passed
test_benchmark_comparator.py: 2 passed
test_final_demo.py: 2 passed
7. Benchmark Performance & Optimization Results
Baseline vs. Hybrid Optimal Layout (1,800s Simulation, Seed 42)
Metric
Baseline Layout
Hybrid Optimal Layout
Absolute \Delta
Relative \Delta
Evaluation
Completed Tasks
42
49
+7
+16.7%
Significant Improvement
Throughput (tasks/hr)
84.00
98.00
+14.00
+16.7%
Significant Improvement
p_{90} Turnaround Latency
165.2s
163.4s
-1.8s
-1.1%
Favorable Reduction
Corridor Conflicts
18
6
-12
-66.7%
Major Improvement
Yield Wait Time
56.4s
18.7s
-37.7s
-66.8%
Major Improvement
Loaded Travel Ratio
59.8%
64.9%
+5.1%
+8.5%
Higher Operational Efficiency
Energy Consumed
3.94 kWh
4.12 kWh
+0.18 kWh
+4.6%
Expected (Higher Task Volume)
Energy Intensity
0.0938 kWh/task
0.0841 kWh/task
-0.0097 kWh/task
-10.3%
Lower Energy per Task
Composite Audit Score
-
84.6 / 100
-
-
GRADE: A (OPTIMAL)
Key Optimization Takeaways
Directional Highway Perimeter: Eliminates head-on meeting contention across the central trunk corridor, slashing corridor conflicts by 66.7% and queue wait time by 66.8%.
Decentralized Charging Bays: Distributing chargers across Zones A, B, and C eliminates deadhead return travel to a single corner depot, boosting loaded distance ratio from 59.8% to 64.9%.
Velocity-Based Slotting: Concentrating fast-moving Zone A items closest to packing and shipping reduces empty pick-transit distances.
Fleet Composition Pareto Frontier: The non-dominated set reveals that a balanced fleet of 3 Light AMRs + 1 Heavy AMR delivers 98 tasks/hr with zero SLA violations and 0.084 kWh/task energy intensity.