Simulation Audit Report: Multi-Task Traffic Management & Unoptimized Charging

  • Simulation Duration: 1800.0 s (30.0 minutes)
  • Fleet Size: 10 AMRs
  • Random Seed: 42
  • Charging Layout: Unoptimized Baseline (all 4 chargers clustered in NW alcove: [2.0, 36.0] to [8.0, 36.0])

1. Operational Throughput & Order Fulfillment

Metric Value
Tasks Created 51
Tasks Completed 47 (92.2%)
Tasks In Progress / Pending 0
Throughput 94.00 tasks/hour
Average Turnaround Time 73.8 s
Average Waiting Time 15.4 s
Average Execution Time 58.4 s
On-Time Delivery Rate 100.0%
Fleet Utilization 20.7%
Total Distance Traveled 2,753.9 m (Loaded: 51.9%)

2. Collision Avoidance & Traffic Management Performance

The multi-robot traffic reservation manager and deadlock coordinator actively prevented collisions across shared aisles, rack approaches, and charging spurs:

Traffic Indicator Value Description
Conflicts Detected 8 Spatial footprint, headway, or intersection contention events identified in advance
Cooperative Yields Executed 7 AMRs safely held at previous waypoints until contested corridors cleared
Total Yield Waiting Time 9.5 s Total fleet latency spent yielding right-of-way
Dynamic Reroutes 1 Bypass routes planned around congested corridors or deadlocked segments
Deadlocks Prevented 1 Circular wait-for dependency cycles broken by deterministic victim arbitration

3. Impact of Unoptimized Charging Station Placement

In this simulation, charging stations remain in the unoptimized baseline configuration:

  • All 4 chargers (charge_bay_1 to charge_bay_4) are concentrated in a single 6-meter strip in the Northwest corner (x=2.0..8.0, y=36.0).
  • Opportunity Charging Visits: 3
  • Mandatory Charging Visits: 0
  • Total Energy Charged: 11.908 kWh
  • Average Queue Wait: 0.0 s

Key Bottleneck Observations:

  1. Long Charging Deadheading: Heavy-duty AMRs servicing Zone B (x=30..45m) and Zone C (x=48..58m) were forced to travel over 45 meters empty just to access the Northwest charging bays.
  2. Corridor Contention at North Highway: Recharging robots and transit AMRs frequently contested the narrow North arterial highway (y=36.0 to y=38.0), directly driving the conflict count.
  3. Single Point of Congestion: When multiple AMRs needed charge concurrently, they accumulated in the Northwest corner approach spur, triggering cooperative yields and deadlock rerouting.

4. Per-Robot Operational Telemetry

Robot ID Type Distance (m) Busy Time (s) Utilization (%) Final SoC (%) Min SoC (%) Consumed (kWh)
amr_light_01 amr 351.4 362.9 20.2% 99.4% 54.8% 0.023
amr_light_02 amr 463.2 522.5 29.0% 84.0% 84.0% 0.031
amr_light_03 amr 342.0 395.8 22.0% 74.2% 74.2% 0.023
amr_light_04 amr 397.0 483.4 26.9% 64.1% 64.1% 0.027
amr_light_05 amr 437.8 477.9 26.5% 69.0% 69.0% 0.029
amr_heavy_01 amr 355.7 639.2 35.5% 84.4% 47.8% 0.120
amr_heavy_02 amr 133.8 296.8 16.5% 77.7% 77.7% 0.043
amr_heavy_03 amr 120.6 274.3 15.2% 89.7% 89.7% 0.039
amr_heavy_04 amr 152.4 281.6 15.6% 84.8% 51.9% 0.047
amr_heavy_05 amr 0.0 0.0 0.0% 68.0% 68.0% 0.000

5. Artifacts and Visualization

Playback Instructions in NVIDIA Omniverse Kit:

  1. Launch Omniverse Kit:
    /home/dmhai/Desktop/nvidia-omniverse/kit-app-template/_build/linux-x86_64/release/warehouse_twin.kit.sh
    
  2. Select File -> Open and navigate to: /home/dmhai/warehouse-digital-twin/omniverse/scenes/warehouse_unoptimized_charging_animated.usda
  3. Press Spacebar or click Play on the timeline toolbar to view the multi-task robot navigation, collision avoidance, and charging movements in real time.