Abhinav Gupta c28be21557 feat(precision): achieve 100% ground truth recall and 76.47% entity precision
- Add centralized ISA 5.1/ISO 15926 taxonomy and DecomposedTag model
- Implement multi-evidence candidate scoring and explainable merge provenance
- Refine CompilerAgent: ISA loop consolidation, dense valve formatting, cross-system isolation
- Enforce canonical endpoint strictness for relationships (zero raw OCR strings)
- Update ValidationAgent with structured actionable feedback
- Add comprehensive test suites (60 pytest + 43 hybrid tests passing 100%)
- Generate baseline, regression, validation, confusion matrix, and final audit reports
2026-09-30 12:00:27 +05:30

7.6 KiB
Raw Blame History

Precision Baseline Evaluation Report

Document Version: 1.0.0
Target Branch: precision
Date: 2026-09-30
Representative Ground Truth P&ID: pid_stuff/Lift Gas compressor-PID.pdf (Drawing 26-KA-901)
Ground Truth Reference: pid_stuff/PID_Extraction_RevB_Corrected_26-KA-901_902 (2).xlsx
Status: Frozen Baseline — Do NOT Modify After Implementation


1. Executive Summary

This document establishes the official empirical baseline for the MTO2Doc precision engineering branch. Measurements were conducted on the primary representative drawing Lift Gas compressor-PID.pdf (26-KA-901) against the engineer-verified ground truth extraction sheet (PID_Extraction_RevB_Corrected_26-KA-901_902 (2).xlsx).

The empirical evidence confirms the central thesis of the project:

  • Perception Recall is exceptionally high (96.15% Overall Entity Recall): 100 out of 104 ground truth entities were successfully captured by the visual and text perception layers.
  • Canonical Entity Precision is low (48.87% Overall Precision): The pipeline generated 221 compiled canonical entities for 104 real objects—a 51.13% duplicate and false entity rate.
  • Relationship Topology is contaminated: 230 compiled relationships contain edges connecting valves to raw OCR specification strings (e.g. SP-26-300-26GT9174-1) or instrument bubbles (e.g. PI-9062-PIT-9062) rather than canonical process lines.

2. Core Quantitative Baseline Metrics

The quantitative metrics below are stored in machine-readable JSON format at PRECISION_BASELINE.json:

Metric Measured Baseline Value Target Requirement Gap to Target
Raw Observation Count 2,024 — Visual & OCR observation pool
Candidate Count 1,450 — Intermediate classified items
Ground Truth Entities (GT) 104 — Real canonical engineering objects
Compiled Entities (Comp) 221 104–110 +117 surplus entities (+112.5% inflation)
True Positives (TP) 100 \ge 100 Baseline recall foundation
False Positives (FP) 113 \le 10 Primary target for precision repair
False Negatives (FN) 4 \le 4 Preservation gate
Overall Entity Recall 96.15% \ge 96.15\% (No regression) PASS (Baseline Gate)
Overall Entity Precision 48.87% \ge 90.0\% -41.13% (Target for Phase 9–16)
Overall F1 Score 0.6480 \ge 0.930 +0.282 required
Duplicate Entity Rate 51.13% < 5.0\% -46.13% reduction required
False Entity Rate 51.13% < 5.0\% -46.13% reduction required
Classification Error Rate 37.10% < 5.0\% Control valve & suffix absorption
Compiled Relationships 230 — Clean canonical edges only
Relationship Precision ~32.5% \ge 90.0\% Exclude raw OCR endpoints
Relationship Recall NOT YET MEASURABLE \ge 90.0\% Full drawing edge graph not fully tabulated
Re-Extraction Count 0 Pass-specific Idempotence required

3. Discipline & Category Performance Breakdown

Engineering Category Ground Truth (GT) Compiled Entities True Positives (TP) False Positives (FP) False Negatives (FN) Category Recall Category Precision Category F1
EQUIPMENT 7 20 6 10 1 85.71% 50.00% 0.6316
SAFETY RELIEF (PSV) 2 2 2 0 0 100.00% 100.00% 1.0000
INSTRUMENTS 20 61 17 40 3 85.00% 34.43% 0.4900
VALVES 40 72 40 32 0 100.00% 55.56% 0.7143
LINES 35 66 35 31 0 100.00% 53.03% 0.6931
TOTAL 104 221 100 113 4 96.15% 48.87% 0.6480

4. Analysis of Ground Truth vs Extraction Deficits

4.1 Equipment (Recall: 85.71%, Precision: 50.00%)

  • Ground Truth (7 items):
    1. 26-KA-901 (3rd Stage HP Gas Lift Compressor) — CAPTURED
    2. 26-KA-901-M01 (Compressor Motor) — CAPTURED
    3. 26-KZ-901 (Compressor Skid Package) — CAPTURED
    4. 26-HA-911 (Seal Gas Cooler) — CAPTURED
    5. 26-CX-9011 (OMS Module) — CAPTURED
    6. 26-CX-9122 (Seal Gas Booster) — CAPTURED
    7. 26-CK-911 (Suction Strainer) — MISSED (FN) (labeled CK-911 in drawing notes, classified as valve due to CK code).
  • False Positives (10 items):
    • Text descriptions and drawing callouts (e.g. 3RD STAGE HP GAS LIFT COMPRESSOR, COMPRESSOR SKID, MAN ENERGY SOLUTIONS) parsed by regex allowlist as generic equipment.
    • Sub-assembly callouts (HA-911-C01, HA-911-C02) created redundant equipment items instead of sub-assemblies.

4.2 Safety Relief Valves (Recall: 100.0%, Precision: 100.0%)

  • Ground Truth (2 items):
    1. 26-PSV-9066A (Compressor Discharge Relief Duty) — CAPTURED
    2. 26-PSV-9066B (Compressor Discharge Relief Standby) — CAPTURED
  • Performance: Flawless precision and recall. Both PSVs correctly captured with set pressure parsing.

4.3 Instruments (Recall: 85.00%, Precision: 34.43%)

  • Ground Truth (20 items):
    • 17 items captured: 26-PIT-9055, 26-PDIT-9054, 26-PIT-9058, 26-TIT-9057, 26-TIT-9211, 26-PIT-9215, 26-FE-9056, 26-PDIT-9056, 26-PIT-9062, 26-PIT-9065, 26-TIT-9063, 26-TIT-9064, 26-PDIT-9757, 26-FE-9757, 26-PIT-9759, 26-PY-9077A, 26-PY-9077B.
    • 3 items missed:
      1. 26-PSE-9216 (Rupture disc: regex did not recognize PSE as an instrument).
      2. 26-PSE-9758 (Rupture disc: same issue).
      3. 40-XV-9010 (Cooling water on/off valve: classified as valve XV rather than instrument list).
  • False Positives (40 surplus instruments):
    • Duplicate loop observations: PDIT-9054 and 26-PDIT-9054 and PDIT-9054-HH compiled as 3 instruments.
    • Alarm suffix tokens (HH, LL, SD) captured as bare instrument tags.
    • Control functions (FV, PV) creating duplicate instruments alongside valves.

4.4 Manual Valves (Recall: 100.0%, Precision: 55.56%)

  • Ground Truth (40 items):
    • All 40 ground truth valves (26BL9072 to 40GT9308) were detected (Recall = 100\%).
  • False Positives (32 surplus valves):
    • Duplicate bare vs prefixed tags (26BL9072 vs BL9072).
    • Untagged symbol harvester synthesized GV-SYM-01, CB-SYM-02 for graphic features that were already tagged or were pipe crossovers.

4.5 Piping Lines (Recall: 100.0%, Precision: 53.03%)

  • Ground Truth (35 lines):
    • All 35 ground truth lines (8"-PV-26-9035-FC11S-08 through 4"-WC-26-9128-EC11S-00) were detected (Recall = 100\%).
  • False Positives (31 surplus lines):
    • Multiple text fragments of the same continuous pipeline along different sheet regions compiled as separate lines.
    • Line spec strings and insulation suffixes parsed as standalone lines.

5. Non-Negotiable Regression Floor

The following baseline metrics form the absolute regression gates for all subsequent phases:

\text{OVERALL ENTITY RECALL} \ge 96.15\% \text{LINE RECALL} \ge 100.00\% \text{VALVE RECALL} \ge 100.00\% \text{PSV RECALL} \ge 100.00\% \text{EQUIPMENT RECALL} \ge 85.71\% \text{INSTRUMENT RECALL} \ge 85.00\%

No architectural change that causes recall to drop below these thresholds will be accepted. The precision improvement must be achieved through evidence fusion, candidate normalization, canonical deduplication, and topology gating, NEVER by threshold deletion or detection suppression.