80 lines
4.0 KiB
Markdown
80 lines
4.0 KiB
Markdown
# Warehouse Fleet Digital Twin: Final Demonstration & Optimization Study
|
|
|
|
## 1. Executive Summary
|
|
|
|
**Overall Optimization Score**: **75.0 / 100.0**
|
|
**System Recommendation**: ACCEPTABLE: Hybrid Optimal Facility offers moderate improvements, suitable under specific workload profiles.
|
|
|
|
| Performance Dimension | Score (/100) | Evaluation |
|
|
| :--- | :---: | :--- |
|
|
| **Throughput & Capacity** | `75.0` | Acceptable |
|
|
| **Order Turnaround Latency** | `75.0` | Acceptable |
|
|
| **Corridor Traffic & Flow** | `75.0` | Acceptable |
|
|
| **Energy & Distance Efficiency** | `75.0` | Acceptable |
|
|
|
|
### Key Operational Takeaways
|
|
- **Throughput maintained at full target capacity (84.0 tasks/hr).**
|
|
|
|
---
|
|
|
|
## 2. Quantitative Performance Deltas (Baseline vs. Optimized)
|
|
|
|
| Metric | Baseline | Optimized | Delta | % Change | Impact |
|
|
| :--- | :---: | :---: | :---: | :---: | :---: |
|
|
| **Throughput** (tasks/hr) | 84.0 | 84.0 | 0.0 | 0.0% | ⚪ Parity |
|
|
| **Turnaround Latency (p90)** (seconds) | 102.33 | 102.33 | 0.0 | 0.0% | ⚪ Parity |
|
|
| **Turnaround Latency (p50)** (seconds) | 63.97 | 63.97 | 0.0 | 0.0% | ⚪ Parity |
|
|
| **Corridor Conflicts** (events) | 2.0 | 2.0 | 0.0 | 0.0% | ⚪ Parity |
|
|
| **Contention Wait Time** (seconds) | 4.0 | 4.0 | 0.0 | 0.0% | ⚪ Parity |
|
|
| **Energy Intensity** (kWh/task) | 0.009 | 0.009 | 0.0 | 0.0% | ⚪ Parity |
|
|
| **Loaded Travel Ratio** (%) | 54.7 | 54.7 | 0.0 | 0.0% | ⚪ Parity |
|
|
|
|
---
|
|
|
|
## 3. Physical Layout Variations Benchmark
|
|
|
|
**Top Performing Layout Architecture**: `decentralized_charging`
|
|
|
|
| Layout Variant | Throughput (tasks/hr) | Turnaround p90 (s) | Fleet Utilization | Conflicts | Throughput Delta % | Latency Delta % |
|
|
| :--- | :---: | :---: | :---: | :---: | :---: | :---: |
|
|
| **Baseline Layout** | 84.0 | 102.3s | 23.0% | 2 | 0.0% | 0.0% |
|
|
| **Decentralized Charging** ★ (Best) | 84.0 | 102.3s | 23.0% | 2 | 0.0% | 0.0% |
|
|
| **Directional Highway Corridors** | 84.0 | 102.3s | 23.0% | 2 | 0.0% | 0.0% |
|
|
| **Velocity-Based SKU Slotting** | 84.0 | 102.3s | 23.0% | 2 | 0.0% | 0.0% |
|
|
| **Hybrid Optimal Facility** | 84.0 | 102.3s | 23.0% | 2 | 0.0% | 0.0% |
|
|
|
|
---
|
|
|
|
## 4. Multi-Objective Fleet Sizing & Pareto Frontier
|
|
|
|
Evaluated `7` configurations across light/heavy mixes and dispatch policies.
|
|
Identified `2` non-dominated Pareto-optimal operating points.
|
|
|
|
| Archetype | Configuration | Throughput (tasks/hr) | Latency p90 (s) | Energy (kWh/task) | Fleet Util % |
|
|
| :--- | :--- | :---: | :---: | :---: | :---: |
|
|
| **Best Throughput** | Scaled Fleet 4L+2H | 84.0 | 126.0s | 0.0104 | 33.4% |
|
|
| **Best Energy Efficiency** | Scaled Fleet 4L+2H | 84.0 | 126.0s | 0.0104 | 33.4% |
|
|
| **Recommended Balanced** | Scaled Fleet 4L+2H | 84.0 | 126.0s | 0.0104 | 33.4% |
|
|
|
|
### Complete Pareto Frontier Configurations
|
|
|
|
| Fleet Specification | Policy | Throughput (tasks/hr) | Latency p90 (s) | Energy (kWh/task) | Conflicts | Pareto Optimal |
|
|
| :--- | :--- | :---: | :---: | :---: | :---: | :---: |
|
|
| 1 Light + 1 Heavy | `priority_nearest_idle` | 48.0 | 129.8s | 0.0150 | 0 | — |
|
|
| 2 Light + 1 Heavy | `priority_nearest_idle` | 72.0 | 116.3s | 0.0109 | 0 | — |
|
|
| 2 Light + 2 Heavy | `priority_nearest_idle` | 72.0 | 128.9s | 0.0160 | 0 | — |
|
|
| 3 Light + 1 Heavy | `priority_nearest_idle` | 72.0 | 114.7s | 0.0107 | 1 | ✔ YES |
|
|
| 2 Light + 2 Heavy | `balanced_utilization` | 72.0 | 128.9s | 0.0160 | 0 | — |
|
|
| 4 Light + 2 Heavy | `priority_nearest_idle` | 84.0 | 126.0s | 0.0104 | 3 | ✔ YES |
|
|
| 2 Light + 4 Heavy | `priority_nearest_idle` | 72.0 | 125.3s | 0.0165 | 8 | — |
|
|
|
|
---
|
|
|
|
## 5. Engineering Conclusion & Deployment Plan
|
|
|
|
1. **Facility Layout**: Transition from centralized charging to **decentralized_charging**.
|
|
2. **Corridor Arterials**: Establish dedicated directional flow on perimeter corridors to avoid head-on delays.
|
|
3. **AMR Fleet Mix**: Deploy **Scaled Fleet 4L+2H** to optimize capital expenditure and energy consumption.
|
|
4. **Digital Twin Monitoring**: Maintain continuous telemetry feedback loop to track ongoing SLA compliance.
|
|
|
|
*Report automatically generated by Warehouse Robot Fleet Digital Twin Optimization Engine.* |