Project Status: Warehouse Robot Fleet Digital Twin

Last Updated: October 19, 2026
Current Phase: Phase 1: Warehouse Model (COMPLETED)
Status: Ready for User Review and Approval


1. Phase Tracker

Phase Description Status Test Coverage
Phase 0 Environment and project foundation COMPLETED 17 passed
Phase 1 Warehouse model COMPLETED 26 passed (100%)
Phase 2 Robot and task models Planned (Next) -
Phase 3 Discrete-event simulation Planned -
Phase 4 Routing and fleet assignment Planned -
Phase 5 Charging and operational constraints Planned -
Phase 6 Analytics and experiment framework Planned -
Phase 7 Omniverse USD visualization Planned -
Phase 8 Operational dashboard Planned -
Phase 9 Optimization and final demonstration Planned -

2. Completed Tasks (Phase 1)

  • Defined complete warehouse domain models in src/warehouse_twin/domain/warehouse.py:
    • Position3D with Euclidean metric and formatting.
    • ZoneArea, ZoneDefinition, WarehouseDimensions.
    • Station, ChargingStation, StorageLocation, WarehouseNode, WarehouseEdge.
    • WarehouseModel constructor parsing raw configuration dictionaries.
  • Created WarehouseGraphBuilder in src/warehouse_twin/routing/graph_builder.py:
    • Unified coordinate hashing to guarantee deterministic waypoint alignment.
    • Perimeter highways: South (y=2.0), North (y=38.0), West (x=2.0), East (x=58.0).
    • Vertical transfer corridors: x=26.0 (Zone A-B transfer), x=46.0 (Zone B-C transfer).
    • Zone internal grid networks for Zone A (x \in [6, 24]), Zone B (x \in [30, 44]), Zone C (x \in [48, 56]).
    • Operational stations: 2 inbound docks, 1 outbound dock, 2 picking stations, 1 production feed.
    • Charging bays: 4 charging stations.
    • Storage racks: 13 storage locations across Zones A, B, and C.
  • Enforced operational movement restrictions:
    • Zone B internal edges restricted exclusively to {"heavy_amr"}.
    • Transit corridors and Zones A & C accessible to both light_amr and heavy_amr.
  • Implemented connectivity validation:
    • Strong connectivity verification (1 component).
    • Operational reachability verification (6/6 stations, 4/4 chargers, 13/13 racks).
    • Sub-graph robot class reachability verification.
    • Raised DisconnectedGraphError and UnreachableStationError on malformed graphs.
  • Implemented structured JSON graph export (results/reports/warehouse_graph.json, 526 KB).
  • Added CLI commands: warehouse-twin validate-graph and warehouse-twin export-graph.
  • Implemented comprehensive unit tests in tests/unit/test_warehouse_graph.py (9 tests, 100% pass rate).
  • Created docs/phases/phase_1_warehouse_model.md.

3. Test & Validation Summary

  • Total Unit Tests Executed: 26
  • Passed: 26
  • Failed: 0
  • Skipped: 0
  • Execution Time: 0.21s
  • Graph Topology: 540 nodes, 1,730 directed edges, 1,692m lane length, strongly connected.
  • CLI Commands: validate-env, validate-config, validate-graph, export-graph all exit with code 0.

4. Known Environment Constraints & Mitigations

  • Primary Disk Space (/dev/nvme0n1p4): 99% used (~8.85 GB free).
    • Graph JSON export is 526 KB.
    • Logs continue to rotate under 10 MB caps.
    • Standalone architecture preserves zero dependency on Isaac Sim.

Obtain user approval for Phase 1 completion, then begin Phase 2: Robot and Task Models (AMR state machine, task lifecycle, payload constraints, compatibility rules, and deterministic fixtures).