Project Status: Warehouse Robot Fleet Digital Twin
Last Updated: October 19, 2026
Current Phase: Phase 1: Warehouse Model (COMPLETED)
Status: Ready for User Review and Approval
1. Phase Tracker
| Phase | Description | Status | Test Coverage |
|---|---|---|---|
| Phase 0 | Environment and project foundation | COMPLETED | 17 passed |
| Phase 1 | Warehouse model | COMPLETED | 26 passed (100%) |
| Phase 2 | Robot and task models | Planned (Next) | - |
| Phase 3 | Discrete-event simulation | Planned | - |
| Phase 4 | Routing and fleet assignment | Planned | - |
| Phase 5 | Charging and operational constraints | Planned | - |
| Phase 6 | Analytics and experiment framework | Planned | - |
| Phase 7 | Omniverse USD visualization | Planned | - |
| Phase 8 | Operational dashboard | Planned | - |
| Phase 9 | Optimization and final demonstration | Planned | - |
2. Completed Tasks (Phase 1)
- Defined complete warehouse domain models in
src/warehouse_twin/domain/warehouse.py:Position3Dwith Euclidean metric and formatting.ZoneArea,ZoneDefinition,WarehouseDimensions.Station,ChargingStation,StorageLocation,WarehouseNode,WarehouseEdge.WarehouseModelconstructor parsing raw configuration dictionaries.
- Created
WarehouseGraphBuilderinsrc/warehouse_twin/routing/graph_builder.py:- Unified coordinate hashing to guarantee deterministic waypoint alignment.
- Perimeter highways: South (
y=2.0), North (y=38.0), West (x=2.0), East (x=58.0). - Vertical transfer corridors:
x=26.0(Zone A-B transfer),x=46.0(Zone B-C transfer). - Zone internal grid networks for Zone A (
x \in [6, 24]), Zone B (x \in [30, 44]), Zone C (x \in [48, 56]). - Operational stations: 2 inbound docks, 1 outbound dock, 2 picking stations, 1 production feed.
- Charging bays: 4 charging stations.
- Storage racks: 13 storage locations across Zones A, B, and C.
- Enforced operational movement restrictions:
- Zone B internal edges restricted exclusively to
{"heavy_amr"}. - Transit corridors and Zones A & C accessible to both
light_amrandheavy_amr.
- Zone B internal edges restricted exclusively to
- Implemented connectivity validation:
- Strong connectivity verification (
1component). - Operational reachability verification (
6/6stations,4/4chargers,13/13racks). - Sub-graph robot class reachability verification.
- Raised
DisconnectedGraphErrorandUnreachableStationErroron malformed graphs.
- Strong connectivity verification (
- Implemented structured JSON graph export (
results/reports/warehouse_graph.json, 526 KB). - Added CLI commands:
warehouse-twin validate-graphandwarehouse-twin export-graph. - Implemented comprehensive unit tests in
tests/unit/test_warehouse_graph.py(9 tests, 100% pass rate). - Created
docs/phases/phase_1_warehouse_model.md.
3. Test & Validation Summary
- Total Unit Tests Executed: 26
- Passed: 26
- Failed: 0
- Skipped: 0
- Execution Time: 0.21s
- Graph Topology: 540 nodes, 1,730 directed edges, 1,692m lane length, strongly connected.
- CLI Commands:
validate-env,validate-config,validate-graph,export-graphall exit with code 0.
4. Known Environment Constraints & Mitigations
- Primary Disk Space (
/dev/nvme0n1p4): 99% used (~8.85 GB free).- Graph JSON export is 526 KB.
- Logs continue to rotate under 10 MB caps.
- Standalone architecture preserves zero dependency on Isaac Sim.
5. Next Recommended Action
Obtain user approval for Phase 1 completion, then begin Phase 2: Robot and Task Models (AMR state machine, task lifecycle, payload constraints, compatibility rules, and deterministic fixtures).