Experiment Report: Baseline Layout (opt_layout_baseline)

1. Executive Summary

Metric Simulated Value Unit Definition / Scope
Simulated Duration 3,600.0 s (1.00 hrs) Total discrete-event simulation time
Wall-Clock Time 0.859 s Compute time required for headless simulation
Random Seed 42 - Deterministic PRNG seed for workload reproducibility
Tasks Created 87 tasks Orders generated by stochastic arrival process
Tasks Completed 86 tasks Successfully picked and delivered orders
Completion Rate 98.8% % Completed / Created ratio
Throughput 86.00 tasks/hr Normalized hourly order fulfillment rate
On-Time Delivery Rate 100.0% % Percentage of tasks completed before deadline
Overdue Tasks 0 tasks Completed missions exceeding target SLA
Missed Deadlines 0 tasks Production-line feed deadline violations
Fleet Utilization 18.8% % Aggregate active busy time / total fleet available time
Total Distance Traveled 5,040.9 m Aggregate distance traversed across all AMRs
Loaded Distance Ratio 51.9% % Loaded transit distance / total travel distance
Total Energy Consumed 0.7342 kWh Load-dependent battery energy draw
Energy Intensity 0.0085 kWh/task Electrical energy consumed per completed mission

2. Latency & Duration Distributions

All duration statistics in seconds (strictly calculated over completed tasks):

Metric Mean Std Dev Min Median (p50) p90 p95 p99 Max
Turnaround Time 78.2s 26.5s 43.3s 72.0s 113.5s 116.9s 173.6s 183.1s
Queue Waiting Time 18.2s 10.0s 6.0s 15.8s 24.0s 25.5s 57.3s 73.8s
Mission Execution 60.0s 19.3s 37.3s 53.0s 88.7s 96.1s 119.5s 120.0s

3. Spatial & Distance Telemetry

  • Total Fleet Distance: 5,040.9 meters
  • Loaded Transit Distance: 2,616.4 meters (51.9% efficiency)
  • Empty Repositioning Distance: 2,424.5 meters
  • Aggregate Busy Duration: 6,757.5 s
  • Aggregate Idle Duration: 29,242.5 s
  • Aggregate Charging Duration: 0.0 s
  • Handling Duration (Pick/Drop): 3,195.0 s
  • Yield & Contention Wait Time: 0.0 s

Individual Robot Fleet Telemetry Matrix

Robot ID Type Total Dist (m) Loaded Dist (m) Empty Dist (m) Utilization Busy (s) Idle (s) Charging (s) Min SoC Final SoC Energy (kWh)
amr_heavy_01 Heavy 345.1 167.9 177.3 18.7% 672 2,928 0 99.2% 99.2% 0.1223
amr_heavy_02 Heavy 570.9 291.1 279.7 33.3% 1,198 2,402 0 98.5% 98.5% 0.2182
amr_heavy_03 Heavy 46.2 27.6 18.6 2.2% 78 3,522 0 99.9% 99.9% 0.0131
amr_heavy_04 Heavy 44.2 23.6 20.6 2.9% 106 3,494 0 99.9% 99.9% 0.0156
amr_heavy_05 Heavy 316.3 151.6 164.7 17.0% 612 2,988 0 99.2% 99.2% 0.1141
amr_light_01 Light 1,370.6 722.2 648.4 42.3% 1,523 2,077 0 96.9% 96.9% 0.0930
amr_light_02 Light 1,002.2 523.6 478.6 30.3% 1,092 2,508 0 97.8% 97.8% 0.0673
amr_light_03 Light 671.0 344.2 326.8 20.5% 737 2,863 0 98.5% 98.5% 0.0454
amr_light_04 Light 452.8 258.2 194.6 13.5% 487 3,113 0 99.0% 99.0% 0.0303
amr_light_05 Light 221.6 106.4 115.2 7.0% 254 3,346 0 99.5% 99.5% 0.0148

4. Energy & Charging Operations

Operational Metric Value Units
Total Fleet Energy Consumed 0.7342 kWh
Total Energy Delivered by Chargers 0.0000 kWh
Net Energy Balance -0.7342 kWh
Minimum Fleet Battery SoC 96.9% %
Average Fleet Battery SoC 98.8% %
Opportunity Charging Sessions 0 sessions
Mandatory Low-Battery Charges 0 sessions
Available Charging Bays 0 stations
Average Bay Occupancy 0.0% %
Average Charging Queue Wait 0.00 seconds

5. Workload Breakdown by Task Type

Task Type Created Completed Pending Failed Throughput (t/hr) Avg Turnaround Avg Wait Avg Exec On-Time %
ORDER_PICK 79 78 0 0 78.0 72.5s 16.6s 55.9s 100.0%
PRODUCTION_LINE_FEED 6 6 0 0 6.0 119.2s 24.7s 94.5s 100.0%
REPLENISHMENT 2 2 0 0 2.0 177.5s 62.9s 114.6s 100.0%

6. Traffic Contention & Bottleneck Diagnosis

  • Traffic Conflicts Detected: 46
  • Yield Waits Executed: 0
  • Cumulative Yield Waiting Time: 0.0 s
  • Deadlock Reroutes Triggered: 0
  • Deadlocks Prevented: 0 (Zero active deadlocks)

Top Contested Corridors & Engineering Recommendations

Severity Corridor Traversals Conflicts Total Wait (s) Recommendation
INFO wp_260_20 <-> wp_240_20 43 5 0.0s Minor transient yielding. Monitor during peak demand shifts.
INFO station_picking_station_a1 <-> wp_260_20 43 5 0.0s Minor transient yielding. Monitor during peak demand shifts.
INFO wp_240_20 <-> wp_260_20 49 3 0.0s Minor transient yielding. Monitor during peak demand shifts.
INFO wp_220_20 <-> wp_200_20 33 3 0.0s Minor transient yielding. Monitor during peak demand shifts.
INFO wp_240_20 <-> wp_220_20 43 3 0.0s Minor transient yielding. Monitor during peak demand shifts.