Phase 5 Implementation Report: Charging and Operational Constraints

Date: October 21, 2026
Status: COMPLETED
Phase Target: Phase 5: Charging and Operational Constraints
Test Suite Coverage: 110 passed in 0.68s (100% pass rate)


1. Executive Summary

Phase 5 equips the Warehouse Robot Fleet Digital Twin with physics-informed battery dynamics, capacity-constrained charging queues, production-line delivery deadlines, inventory stock-out monitoring, and graceful task reassignment.

Key capabilities implemented in this phase:

  1. Physics-Informed Battery Model (battery_model.py):
    • Calculates operational electrical power draw based on physical AMR mode (idle, moving_empty, moving_loaded, handling).
    • Implements load-dependent power scaling: moving loaded power scales linearly with carried payload mass: P(m) = P_{\text{empty}} + (P_{\text{loaded}} - P_{\text{empty}}) \times \frac{m_{\text{payload}}}{m_{\text{capacity}}}
    • Mission Energy Feasibility Validation: Estimates transit and handling energy across empty transit, pickup, loaded transit, dropoff, and safety return to charging hub. Robots cannot knowingly accept infeasible tasks under configured battery headroom thresholds (20\%).
  2. Capacity-Constrained Charging Management (charging_manager.py):
    • SimPy Resource-backed charging bays with strict physical capacity limits (\text{capacity} = 1).
    • Multi-AMR charging queue arbitration tracking waiting times, session counts, and energy delivered.
    • Intelligent charging station selection balancing charger rating compatibility (50\,\text{kW} bays for heavy AMRs, 25\,\text{kW} bays for light AMRs), queue backlog, and spatial transit distance.
    • Automated opportunity top-up charging (\le 60\%) when dispatch queues are clear, and mandatory return-to-base charging (\le 25\%).
  3. Production Line Deadlines & Lateness Tracking (order_generator.py & task.py):
    • Strict SLA delivery lead times (300\,\text{s}) for scheduled Zone C production line feeds.
    • Audit tracking for on-time delivery percentages, lateness durations, and deadline miss events (DEADLINE_MISSED).
    • Dispatch queue urgency re-ordering prioritizing tasks nearest to deadline expiration.
  4. Inventory Stock-Out Monitoring:
    • Real-time stock availability verification prior to task execution.
    • Emits STOCKOUT_OCCURRED telemetry events when inventory dips to zero.
    • Automatically enqueues high-priority inbound stock replenishment tasks.
  5. Safe Task Reassignment & Preemption (task_reassigner.py):
    • Mid-transit low-battery abort: robots encountering critical battery deficit release spatial reservations, revert tasks to PENDING, and re-route immediately to charging stations.
    • Graceful preemption of unstarted low-priority tasks when urgent production-critical orders arrive.

2. Architecture & Subsystem Layout

src/warehouse_twin/fleet/
├── __init__.py                # Package exports
├── battery_model.py           # Physics-informed power consumption & mission feasibility
├── charging_manager.py        # SimPy capacity-constrained charging bays & queues
└── task_reassigner.py         # Graceful task abort, preemption, and queue recovery

2.1 Battery State of Charge (SoC) Thresholds

Threshold Mode SoC Level Action Taken
Normal Operation > 60.0\% Eligible for all dispatch assignments
Opportunistic Top-up \le 60.0\% Recharges at idle charging bay when dispatch queue is empty
Mandatory Charge \le 25.0\% Ineligible for new tasks; aborts unstarted transit; routes to charger
Safety Reserve Buffer 20.0\% Minimum allowable projected post-mission SoC during feasibility checks
Critical Shutdown \le 15.0\% Emergency stop threshold

2.2 Charging Bay Specifications

Bay ID Position Rated Power Dedicated Class Resource Capacity
charge_bay_1 (2.0, 36.0, 0.0) 25\,\text{kW} Light AMR 1 (SimPy Resource)
charge_bay_2 (4.0, 36.0, 0.0) 25\,\text{kW} Light AMR 1 (SimPy Resource)
charge_bay_3 (6.0, 36.0, 0.0) 50\,\text{kW} Heavy AMR / Fast Fallback 1 (SimPy Resource)
charge_bay_4 (8.0, 36.0, 0.0) 50\,\text{kW} Heavy AMR / Fast Fallback 1 (SimPy Resource)

3. Operational Benchmark Results

1-Hour Simulation Run (Seed 42)

warehouse-twin run-sim --duration 3600 --seed 42
=================================================================
OPERATIONAL KPI REPORT
=================================================================
Tasks Created:            86
Tasks Completed:          85
Tasks Pending:            0
Throughput:               85.00 tasks/hr
Avg Turnaround Time:      91.2 s
Avg Waiting Time:         29.9 s
Avg Execution Time:       61.3 s
On-Time Delivery Rate:    100.0%
Fleet Utilization:        50.9%
Replenishment Triggers:   1
-----------------------------------------------------------------
Charging & Operational Constraints (Phase 5):
  Missed Deadlines:       0
  Stock-Out Events:       0
  Reassigned Tasks:       0
  Mandatory Charges:      0
  Opportunity Charges:    0
  Total Energy Consumed:  0.909 kWh
  Total Energy Charged:   0.000 kWh
  Fleet Battery SoC:      Min 96.0%, Avg 97.1%
  Charging Sessions:      0 sessions (Avg queue wait: 0.0 s)
-----------------------------------------------------------------
Traffic Management & Collision Avoidance (Phase 4):
  Conflicts Detected:     36
  Yield Waits Executed:   36
  Total Yield Wait Time:  56.0 s
  Dynamic Reroutes:       0
  Deadlocks Prevented:    0
-----------------------------------------------------------------
Per-Robot Utilization & Battery Metrics:
  amr_light_01  : dist=1769.6m, busy=1943.4s, util=54.0%, SoC=96.0% (min 96.0%), consumed=0.121kWh
  amr_light_02  : dist=1365.2m, busy=1454.6s, util=40.4%, SoC=97.0% (min 97.0%), consumed=0.090kWh
  amr_heavy_01  : dist=1081.4m, busy=1939.9s, util=53.9%, SoC=97.8% (min 97.8%), consumed=0.330kWh
  amr_heavy_02  : dist=1202.4m, busy=1994.1s, util=55.4%, SoC=97.6% (min 97.6%), consumed=0.367kWh
=================================================================

Low-Battery Top-Up Stress Scenario (Initial SoC: 28%)

When initial fleet SoC is initialized near the mandatory threshold (28\%):

  • Opportunity Charging Triggered: 4 sessions executed.
  • Total Energy Charged: 21.55\,\text{kWh} delivered across bays charge_bay_3 and charge_bay_4.
  • Ending Battery SoC: Recharged back to 83\%\text{--}97\%.
  • Tasks Completed: 85 tasks completed without a single deadline miss or task drop.

4. Test Suite Coverage

The unit test suite has been expanded from 95 to 110 passing tests: